Progress on frames and FCCLB prepares for a BOOM (lift)

This week I am beginning work on the wooden frames that operate as functional stops that hold the stained glass panes in place (see second post for pictures of stops in place). The stops were removed along with the stained glass windowpanes back in August. They have been stabilized with epoxy and are now ready for fine detail work. Before that can happen, all of the stops must be photographed and notes on their condition must be taken so that future generations will know what was done to them. Here are a few shots of my documentation process.

img_5808

My lovely photography set up.

img_5807

Example of documentation image.

img_5795

Bundled teardrop frames

 

img_5796

Half of the bundled ‘circular’ window frames.

Also, the church will be renting a boom lift to complete an investigation of the terracotta to locate buried metal. The metal anchors that hold the blocks together have corroded and are potentially the cause of many of the cracks. By mapping the metal and surrounding cracks we can determine the validity of a causal relationship and begin to find ways to address the problems. I have included two images from the National Terracotta Society’s 1914 manual that illustrate the types of metal we are hoping to find.

rose-window-tc-1914tc-iron-hangers-1914

One comment

Leave a comment