Deck the halls with scaffolding!

Many of you who were at Christmas service may be wondering why there is scaffolding under the east window again. The answer is because of further investigations by the preservation team. Several architectural conservators will be examining the interior window to learn how it was put together. Their investigation is timed to preface the boom lift that was mentioned a few posts ago.

img_6121

Through the course of our discussions it has become apparent that the north and east facades must be treated simultaneously. There are only four terra cotta manufacturers in the world. There is a lag between when the order is placed and the replacements are made and shipped. Ordering all of the replacement parts at once reduces the cost of shipping and the time to get the terra cotta pieces. To figure out how many total parts are going to be needed both facades must be examined.

img_5975

 

The north side may also be built differently than the east. The north cornice collapsed in the 1933 earthquake. It was rebuilt without the decorative brickwork that the east side has. This indicates that the church was not opposed to making significant changes to meet their budget. Further study should expose their alterations and help us address those problems specifically.

 

img_6162

To reach the north window a boom lift must be placed in the bike lane on 3rd St., which needs approval from the city. A permit requires proof of licenses, insurance, city approval of the insurance, a city endorsement, and other logistical information. It takes quite a bit of time to gather all of the materials and for the city to process the information. The investigation days have had to be rescheduled twice because of difficulties with the paperwork. Hopefully the boom lift will be coming soon, and all of the internal metal will be revealed. We will keep you posted!