What is going on in the Koinonia Room?

One of the more pressing questions the Historic Preservation Committee has been receiving as of late is about the scaffolding in the Koinonia Room. Aren’t we just dealing with the rose window? The answer is we are dealing with both simultaneously.

DSCN7438

The skylights in the Kononia Room have bowed significantly in their frames. Their state of deterioration is such that repair work cannot wait without further risk of endangering the people below if a seismic event were to occur. Their removal also coincided well with the removal of the rose window so both stained glass pieces are being addressed at the same time.

Screen Shot 2016-08-12 at 11.33.19 AM

Screen Shot 2016-08-12 at 11.31.23 AM

While the glass is removed church staff will also be repainting the interior of the skylights and addressing the rusting on the frames. The process should take a few weeks. Preventive maintenance like this will ensure that the newly cleaned and repaired glass will stay secure in their frames for a long time to come.

DSCN7516

Interior of skylight. Note rust on frame and previous water damage.

DSCN7462

Removed skylights being cleaned

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s